The house was constructed to a very high standard and completed within 20 weeks.
The design for the house and landscaping was created by our internal Architecture team in consultation with the local planners.
One-off Builds
CLT (cross laminated timber) Structures
Timber Frame
SIPS (Structural Insulated Panel System)
First fix and second fix works
The house was constructed to a very high standard and completed within 20 weeks.
The design for the house and landscaping was created by our internal Architecture team in consultation with the local planners.