Completed to a very high standard in 39 weeks.
The design for the house and landscaping was created by our internal Architecture team in consultation with the local planners.
One-off Builds
CLT (cross laminated timber) Structures
Timber Frame
SIPS (Structural Insulated Panel System)
First fix and second fix works
Completed to a very high standard in 39 weeks.
The design for the house and landscaping was created by our internal Architecture team in consultation with the local planners.