CLT Ice Rink in Cambridge, Cambridgeshire
A sizeable and impressive structure, Mint constructed this roof made up of 38m long, 12 tonne heavy glulam beams. Built with precision, the finished product took just 2 weeks to install and an extra two weeks to screw and fix.